Prepare your plan
Use what you already know about your site. No inspection, measurements inside equipment or electrical testing are needed. An unknown answer is useful: it identifies a question for assessment.
Your plan
Your result is yours to keep. It is not sent to the quote form.
Assumptions and limitations
This is a preparation checklist, not a suitable/unsuitable verdict. It does not assess supply capacity, charging speed, electrical protection, installation cost or approval requirements. Owner permission does not replace any other required consent. The installer must assess the site and relevant network processes.